Manufacturing 4.0 Operations Scheduling with AGV Battery Management Constraints - Université Polytechnique des Hauts-de-France Access content directly
Journal Articles Energies Year : 2020

Manufacturing 4.0 Operations Scheduling with AGV Battery Management Constraints

Abstract

The industry 4.0 concepts are moving towards flexible and energy efficient factories. Major flexible production lines use battery-based automated guided vehicles (AGVs) to optimize their handling processes. However, optimal AGV battery management can significantly shorten lead times. In this paper, we address the scheduling problem in an AGV-based job-shop manufacturing facility. The considered schedule concerns three strands: jobs affecting machines, product transport tasks’ allocations and AGV fleet battery management. The proposed model supports outcomes expected from Industry 4.0 by increasing productivity through completion time minimization and optimizing energy by managing battery replenishment. Experimental tests were conducted on extended benchmark literature instances to evaluate the efficiency of the proposed approach.
Fichier principal
Vignette du fichier
energies-13-04948-v2.pdf (544.33 Ko) Télécharger le fichier
Origin : Publication funded by an institution
Licence : CC BY - Attribution

Dates and versions

hal-03426790 , version 1 (21-04-2022)

Licence

Attribution

Identifiers

Cite

Moussa Abderrahim, Abdelghani Bekrar, Damien Trentesaux, Nassima Aissani, Karim Bouamrane. Manufacturing 4.0 Operations Scheduling with AGV Battery Management Constraints. Energies, 2020, 13 (18), pp.4948. ⟨10.3390/en13184948⟩. ⟨hal-03426790⟩
27 View
82 Download

Altmetric

Share

Gmail Facebook X LinkedIn More